Reliable production partner for high-volume rollouts
ARCH
HVAC
Electrical
Plumbing
What we do
Store adaptation aligned with brand guidelines
Comprehensive construction documentation (AR + MEP)
Seamless cross-disciplinary coordination
Rapid rollout across multiple locations
Typical turnaround: 10–14 working days per store
CLIENT CHALLENGES
Rollouts stall due to limited internal capacity
Poor MEP coordination bottlenecks store openings
Standard concepts require heavy adaptation on-site
Overlapping multi-store deadlines overwhelm internal teams
We eliminate these bottlenecks by serving as your dedicated rollout production team
Cases:
2025 Retail Store
PART OF MULTI-STORE ROLLOUT PROGRAM
• Location: Intercity Mall, Lviv • Area: 632 m² • Scope: Full AR + MEP working drawings • Delivery time: 14 working days • Result: delivered within rollout schedule
2025 Retail Store
PART OF MULTI-STORE ROLLOUT PROGRAM
• Location: Mukachevo, Rosvihivsky • Area: 486 m² • Scope: Full working drawings (AR + MEP) • Adaptation to shoppingmall conditions • Fast rollout delivery
2025 Retail Store
PART OF MULTI-STORE ROLLOUT PROGRAM
• Location: Odesa, Rivera Mall • Area: 959.19 m² • Scope: Full working drawings (AR + MEP) • Adaptation to shoppingmall conditions • Fast rollout delivery
2025 Retail Store
PART OF MULTI-STORE ROLLOUT PROGRAM
• Location: Poltava, Khmelnytskoho • Area: 554.42 m² • Scope: Full working drawings (AR + MEP) • Adaptation to shoppingmall conditions • Fast rollout delivery
2025 Retail Store
PART OF MULTI-STORE ROLLOUT PROGRAM
• Location: Mukachevo, Rosvyhivsky • Area: 484.56 m² • Scope: Full working drawings (AR + MEP) • Adaptation to shoppingmall conditions • Fast rollout delivery
What we offer
End-to-end delivery of retail rollout projects
HOW TO GET STARTED:
Kick off with: A single pilot store or A trial design package
Evaluate: – turnaround speed – communication – documentation quality
RISK-FREE FOR YOUR TEAM NO LONG-TERM COMMITMENT REQUIRED